午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務,零缺陷,輔助研發”PCBA訂購單需求。
PCBA加工
PCBA加工
SMT solves printing problems and lead-free soldering
04Dec
Boy 0條評論

SMT solves printing problems and lead-free soldering

SMT solves printing problems and lead-free soldering
In the electronIC industry, SMT chip processing is mainly processed by SMT, and many failures will occur in the use process According to statistics, 60% of the defects are caused by solder paste printing Therefore, to ensure the high quality printing of SMT is an important prerequisite to ensure its processing quality The following describes how to solve printing errors during the repair process
5 * 1. There is no gap between the template and PCB printing method, that is, "touch printing". High stability requirements for various structures, suitable for printing high-precision solder paste. The metal plate is in good contact with the printed board and can be separated from the PCB after printing. This method has high printing accuracy, and is especially suitable for fine and super macro printing.
1. Printing speed.
The solder paste rolls forward when scraping. Suitable for screen printing and fast printing.
This rebound can also prevent solder paste leakage. In addition, the paste cannot be rolLED on the network, resulting in clear solder paste and too fast printing speed.
The dimension of is 10 * 20 mm/s.
2. Printing method:

PCBA

Contact or non-contact printing The printing method of screen printing and PCB blank is "non-contact printing", generally 0.5 * 1.0mm, which is applicable to solder pastes with different viscosities Push the solder paste into the steel MESh and press the PCB with a scraper After removing the scraper, the wire mesh is isolated from the PCB board, thus reducing the risk of vacuum leakage to the wire mesh
3. Scraper type:
The scraper is divided into plastic scraper and steel scraper. For integrated circuits with a distance less than 0.5mm, steel solder paste can be used to form solder paste after printing.
Scraper adjustment.
In the welding process, the scraper working point is printed along the 45 ° direction, which can significantly improve the non-uniformity of the opening and reduce the damage of the steel plate and the opening. The pressure of the scraper is usually 30N/mm.
SMT wafer processing
2. During installation, select IC installation height with spacing no more than 0.5mm, 0mm or 0~-0.1mm to avoid solder paste falling off due to low installation height and short circuit during reflow.
Remelt welding.
The main reasons for assembly failure caused by reflow welding are as follows:
First, the temperature rises too fast;
B. High temperature and overheating;
The heating speed of solder paste is faster than that of circuit board;
D. Excessive water.
This, when determining the remelting welding process parameters, all factors shall be fully considered to ensure that there is no problem in welding quality before large-scale assembly.
Introduction to SMT processing lead-free welding and maintenance
The introduction of lead-free chip assembly has always been the challenge of the first assembly, because it will face more challenges when processing and rework are needed. The maintenance of PCBA in lead-free environment will have higher cost, quality details, time and repeatability problems, but due to lead-free requirements, these problems need attention. Due to the need for lead-free processes:
1. Train lead-free assembly, maintenance and inspection operators and evaluate time and cost.
2. The prices of lead-free solders are higher than those of traditional solders, such as lead-free wires, rods and core solders.
3. The processing temperature of lead-free components (about 30-35 ° C) requires higher precision and precision.
4. Lead free technology also needs to study and plan SMT processing plants to establish correct PCBA repair process.
First of all, it is necessary to analyze the technical personnel according to the characteristics of lead-free process. To define rework standards, whether standard solder or lead-free solder is required, the process is the same, and the required steps are:
Define and execute an accurate thermal profile.
2. The faulty component must be removed.
3. Clean all rust or solder residues on site and prepare new parts.
4. Replace parts with new solder and flux and reflow.
5. Thoroughly check the rework.
In a lead-free environment, accurate and reliable rework is more difficult because PCBA and the parts closest to maintenance must undergo multiple high-temperature cycles. In order to protect the stability of the circuit board, the preheating temperature should be set within the range not higher than the glass transition temperature of the PCB data.
The subsequent steps involved in the rework process vary depending on the lead-free requirements The difference between standard and lead-free brings many challenges, which can only be solved by introducing new or changed technologies, including stricter and more accurate thermal curves, as well as in the whole PCBA maintenance process With this kind of pipe, many expensive problems caused by different heat distribution can be avoided
點擊
然后
聯系
主站蜘蛛池模板: 国产v亚洲v天堂无码网站| 九九久久99综合一区二区| 好男人好资源在线观看免费视频| 久青青在线观看视频国产| 97超级碰碰碰久久久久| 国产黄a三级三级三级av在线看 | 亚洲高清成人aⅴ片| 国产精品美女久久久久久| 精品人伦一区二区三区潘金莲| 性做爰高清视频在线观看视频| 国产精品亚洲一区二区三区在线| 日韩欧美高清dvd碟片| 人妻天天爽夜夜爽一区二区| 精品无码一区二区三区不卡| 中文字幕无码日韩中文字幕| 性欧美俄罗斯乱妇| 玖玖资源站亚洲最大的网站| 国产99视频精品免费视频76| 人人人妻人人人妻人人人| 亚洲欧洲国产综合aⅴ无码| 亚洲精品无码mⅴ在线观看| 五十路熟妇高熟无码视频| 亚洲色欲色欲大片www无码| 裸体美女无遮挡免费网站| 2020最新国产自产精品| 久久久久久亚洲精品成人 | 激情五月色综合国产精品| 午夜在线观看免费线无码视频| 国产美女狂喷水潮在线播放| 香蕉久久夜色精品国产尤物 | 亚洲精品国产成人99久久| 国产无套粉嫩白浆在线观看| 国产成人啪精品视频免费软件| 国产亚洲视频在线播放香蕉| 中文字幕久久精品一区二区三区| 国产超碰人人爽人人做| 又色又爽又高潮免费观看| 亚洲熟女av乱码在线观看漫画 | 亚洲国产亚综合在线区| 日韩精品无码综合福利网| 与子敌伦刺激对白播放|