午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務(wù),零缺陷,輔助研發(fā)”PCBA訂購單需求。
PCB制造
PCB制造
Copper Sinking Process in PCB Production
04Dec
Summer 0條評論

Copper Sinking Process in PCB Production

Perhaps we may be surprised that the substrate of the pcb circuit board only has copper foil on both sides, while the middle is the insulating layer. So they do not need to be connected between two or more layers of circuits of the PCB circuit board? How can the circuits on both sides be connected together to make the current flow smoothly?


pcb


Now let's see the PCB circuit board manufacturer explain the magIC process - copper deposition (PTH).

Copper plating is the abbreviation of Eletcroless Plating Copper, also known as Plated Through hole, abbreviated as PTH, which is a self catalyzed redox reaction. The process of PTH shall be carried out after the drilling of two or more layers of boards is completed.

Function of PTH: chEMIcally deposit a thin layer of chemical copper on the drilLED non-conductive hole wall substrate as the base for subsequent copper electroplating.

Decomposition of PTH process: alkaline degreasing secondary or tertiary countercurrent rinsing roughening (micro etching) secondary countercurrent rinsing pre leaching activation secondary countercurrent rinsing degumming secondary countercurrent rinsing copper precipitation secondary countercurrent rinsing acid leaching

PTH detailed process explanation:

1. Alkaline degreasing: remove oil stains, fingerprints, oxides, and dust in the hole; The hole wall is adjusted from negative charge to positive charge, which is convenient for the adsorption of colloidal palladium in the subsequent process; Cleaning after oil removal shall be carried out in strict accordance with the requirements of the guidelines and shall be tested by copper sinking backlight test.

2. Micro etching: remove the oxide on the board surface, coarsen the board surface, and ensure a good adhesion between the subsequent copper deposition layer and the base copper; The newly formed copper surface has strong activity and can well adsorb colloidal palladium;

3. Pre leaching: It is mainly to protect the palladium tank from the pollution of pre-treatment tank liquid, and extend the service life of the palladium tank. The main components are consistent with those of the palladium tank except palladium chloride, which can effectively wet the hole wall, so that subsequent activation liquid can enter the hole in time for sufficient and effective activation;

4. Activation: after the adjustment of the polarity of alkaline oil removal by pretreatment, the positively charged pore wall can effectively absorb enough negatively charged colloidal palladium particles to ensure the average, continuity and compactness of subsequent copper deposition; Therefore, oil removal and activation are crucial to the quality of subsequent copper deposition. Key control points: specified time; Standard stannous ion and chloride ion concentration; The specific gravity, acidity and temperature are also very important, which should be strictly controlled according to the operation instructions.

5. Degumming: remove the stannous ions wrapped outside the colloidal palladium particles, expose the palladium core in the colloidal particles, and directly and effectively catalyze the chemical copper precipitation reaction. Experience shows that it is a better choice to use fluoroboric acid as the degumming agent.

6. Copper precipitation: the autocatalytic reaction of chemical copper precipitation is induced by the activation of palladium core. Both the new chemical copper and the reaction by-product hydrogen can be used as the reaction catalyst to catalyze the reaction, so that the copper precipitation reaction continues. After being treated by this step, a layer of chemical copper can be deposited on the plate surface or hole wall. During the process, the tank liquid shall be stirred with normal air to convert more soluble copper.

The quality of the copper sinking process is directly related to the quality of the production PCB circuit board. It is the main source process of blocked vias and poor open and short circuits, and it is not convenient for visual inspection. The subsequent process can only be probability screened through destructive experiments, and can not effectively analyze and monitor individual PCB boards. Therefore, once problems occur, they must be batch problems. Even if the test can not be completed, the final product will cause great potential quality problems, It can only be scrapped in batches, so it is necessary to strictly follow the parameters in the operation instructions.

點擊
然后
聯(lián)系
主站蜘蛛池模板: 久久精品99av高久久精品| 欧美大片18禁aaa免费视频| 黄桃av无码免费一区二区三区| 免费又黄又爽1000禁片| 老子影院午夜伦不卡| 国产真实伦对白全集| 中文字幕乱码在线人视频| 国产末成年女av片一区二区| 国产无夜激无码av毛片| 中文亚洲爆乳av无码专区| 欧洲美洲精品一区二区三区| 影音先锋在线亚洲网站| 国产精品自在在线午夜精华在线| 成人动漫在线观看| 麻豆丰满少妇chinese| 青青草av国产精品| 青草久久久国产线免观| 国产一二三四区乱码免费| 18禁无遮挡无码网站免费| 国产suv精品一区二区五| 狠狠色丁香婷婷综合尤物| 曰本a∨久久综合久久| 亚洲精品第一国产综合国服瑶| 欧美丰满熟妇bbbbbb百度| 狠狠色丁香婷婷第六色孕妇 | 韩国精品无码久久一区二区三区| 99精品视频九九精品视频| 中国娇小与黑人巨大交| 亚洲中文无码成人手机版 | 99热精品毛片全部国产无缓冲| 国产00高中生在线无套进入| 国产乱子伦精品无码专区| 做受??高潮片少萝| 丝袜美腿丝袜亚洲综合| 扒开双腿猛进入喷水高潮视频| 色老头精品午夜福利视频| 国产尤物av尤物在线观看 | 日本高清视频www| 99精品丰满人妻无码a片| 无码伊人久久大杳蕉中文无码| 日本xxxx色视频在线播放|