午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務(wù),零缺陷,輔助研發(fā)”PCBA訂購單需求。
行業(yè)新聞
行業(yè)新聞
Solution to Material Dispersal in PCBA Production
01Dec
Boy 0條評論

Solution to Material Dispersal in PCBA Production

Solution to Material Dispersal in PCBA Production
PCBA manufacturing is an indispensable step in the process of electronIC equipment design and production The PCB carries the control system of electronic equipment Its quality directly affects the operation of electronic equipment and product quality Good products are inseparable from high-quality PCBA manufacturing and PCB support In PCBA manufacturing, we will inevitably encounter some problems
PCBA manufacturing
Today, kingford will explain one of the PCBA manufacturing solutions: the cause and solution of throwing
Cause 1: nozzle problems, such as nozzle deformation, blockage, damage caused by insufficient air pressure, air leakage, inability to pick up suction, improper selection of data, failure to pass identification but thrown by PCBA.
Countermeasures: Clean and replace the nozzle;
Cause 2: Feeder failure or defect caused by feeder problem, incorrect feeder setting, distorted position, poor feeder mechanism, and PCBA throwing.
Countermeasures: reset the feeder, clean the equipment, calibrate or replace the feeder.
Cause 3: identification system problem, poor vision, unclean vision or laser lens, foreign matter interference identification, improper selection of identification light source or insufficient intensity and gray scale, or possible poor identification system.
Countermeasures: Clean and wipe the surface of the identification system, keep it clean, free of foreign matters and oil contamination, adjust the intensity and gray scale of the light source, and replace the identification system components;
Cause 4: position problem, position deviation, the nozzle is not in the data center when sucking, and the data height is incorrect (usually 0.05 mm after contacting the parts), resulting in deviation, incorrect data, and deviation. When it does not match the corresponding data parameters, the identification system will discard it as invalid data.
Countermeasures: Adjust the feeding position, height and other parameters;
Cause 5: Vacuum problem, insufficient air pressure, insufficient vacuum gas pipe channel, foreign matter blocking the vacuum pipe, or insufficient air pressure caused by vacuum leakage, which makes it impossible to pick up data or fall off during pasting.
Countermeasures: Adjust the pressure value at the air pressure steep slope according to the equipment requirements (generally 0.5~0.6MPa for the chip mounter), clean the ventilation pressure pipe, and repair the air leakage channel;
Cause 6: The program problem of the slicer, the incorrect parameter setting of the component in the program being edited, and the inconsistency with the data size, incoming brightness and other parameters LED to the identification failure and discard.
Countermeasures: Modify the element parameters and find the best parameter value of the element;
Cause 7: Nonconforming products such as problems with incoming materials, non-standard incoming materials or oxidation of incoming pins.
Countermeasures: IQC shall do a good job in incoming material inspection and contact parts suppliers;
Cause 8: Feeder failure, feeder deformation, feeder feeding defects (feeder ratchet gear damage, feeder ratchet gear belt without holes, foreign matters under the feeder, aging spring, insufficient force or poor power), resulting in failure or poor feeding, PCBA throwing, and feeder damage.
Countermeasures: correct the feeder, clean the feeder platform, and replace damaged parts or feeder;
pcba


PCBA


According to relevant research, static electricity is also the cause of PCBA falling. This placement machine should be grounded and anti-static work should be done at the production site.
It is normal for the placement machine to throw PCBA, but if the high throw rate of PCBA seriously affects the production efficiency and production cost, it must be solved. In case of serious PCBA throwing, you can ask the on-site personnel first, and then observe and analyze according to the above seven reasons to find out the problem directly, so as to find out the reason more effectively and solve the problem. While improving the production efficiency, it takes up too much machine production time.

點擊
然后
聯(lián)系
主站蜘蛛池模板: 日韩激情电影一区二区在线| 亚洲熟妇自偷自拍另欧美| 国产xxxx69真实实拍| 99视频精品全部免费 在线| 国产免费无码av片在线观看不卡 | 日韩av影院在线观看| 国精产品一二三区精华液| 少妇激情av一区二区三区| 成在人线av无码免费看网站| 2021国产精品香蕉在线观看| 欧美日本一区二区视频在线观看| 久久av嫩草影院| 久久久久无码精品国产app| 国内大量揄拍人妻精品視頻| 亚洲国产成人爱av在线播放| 国产精品igao视频网网址| 国产精品久久久久久不卡盗摄| 久久亚洲精品人成综合网| 久久久久久国产精品无码超碰| 欧美丰满熟妇xxxx性ppx人交| 久久av无码aⅴ高潮av喷吹| 无码av免费一区二区三区| 国产碰在79香蕉人人澡人人看喊| 国产md视频一区二区三区| 国产女主播高潮在线播放| 国内精品久久久久影院日本| 久久久成人精品av四区| 国产美女极度色诱视频www| 亚洲无av码在线中文字幕| 精品无码一区二区| 精品亚洲国产成人蜜臀av| 欧洲精品不卡1卡2卡三卡| 国产va免费精品高清在线| 精品人妻久久久久久888| 337p西西人体大胆瓣开下部| 俄罗斯美女真人性做爰| 久久www成人看片免费不卡| 国产日韩成人内射视频| 国产性夜夜春夜夜爽| 精品一卡二卡三卡| 国产69成人精品视频免费|