午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務,零缺陷,輔助研發”PCBA訂購單需求。
行業新聞
行業新聞
Prevention and treatment of reflow soldering of smt
02Dec
Boy 0條評論

Prevention and treatment of reflow soldering of smt

Prevention and treatment of reflow soldering of SMT
Reflow soldering is the key process of SMT placement in the welding process You may encounter various unexpected situations during your work If proper handling methods and necessary measures are not taken, serious safety and quality accidents may occur
1. Precautions
1. The reflow furnace must fully reach the set temperature (green light on) before welding.
2. During welding, the temperature change of each temperature zone is often observed, with the variation range of ± 1 ℃ (according to the reflow furnace).
3. When the SMT chip processing equipment is abnormal, it should be shut down immediately.
4. The size of the base plate shall not be greater than the width of the conveyor belt, otherwise board card accidents may easily occur.
5. Before welding, SMT processing plant shall take protective measures (mask) or avoid reflow welding for parts that cannot withstand normal welding temperature according to the provisions of process files or component packaging instructions. After welding with manual welding or welding robot.
Circuit board


PCBA


6. During SMT repair welding, strICtly prevent the conveyor belt from vibration, otherwise it will lead to component displacement and welding spot interference
7. Regularly measure the exhaust volume of the air outlet of the reflow soldering furnace. The air displacement directly affects the welding temperature.
2. Emergency treatment
1. Card board
1. If the plate is stuck, do not feed the plate into the furnace.
2. Open the furnace cover and take out the steel plate.
3. Find out the cause and take measures.
4. When the temperature reaches the required temperature, continue welding.
2. Alarm
If an alarm occurs, stop welding, check the cause of the alarm and deal with it in time
3. Sudden power failure
1. In case of power failure, do not send the plate into the furnace again. The conveyor belt or track will continue to run due to the support of various power supplies behind the UPS. After the surface mount plate runs to the furnace mouth and all the surface mount plates are connected, open the furnace cover and cool down, and then stop the machine.
2. Under unexpected circumstances, if the UPS fails, use a spanner wrench to clamp the square shaft rotating motor at the motor outlet, and take the PCB out of the furnace as soon as possible.
Why should SMT factory pay attention to the site
(1) "Three principles" of "site, existing and reality"
The continuous improvement of the site is considered to be the secret of the success of the Japanese company. The "three site principles" of "site, site and reality" reflect the importance of site and the concept of continuous improvement, and are widely used in Japanese enterprises. "Site" is the place where products are produced and services are provided; "Real things" are the main body of the website, which may be machine failures, unqualified products, damaged tools or customer complaints; "Reality" is to analyze real things on the spot and solve problems.
The "Three Presence Principles" emphasize that managers should go to the site to analyze and solve the problems of existing objects. When a problem occurs, the place to solve the problem should be the site, not the office or meeting room. On site, managers can usually find problems and take countermeasures in a timely manner by checking objects, observing, touching, feeling, and combining their own experience.
Give play to the role of the "three presence principle" and develop into the "five presence technology": on-site, physical, real, cash and current identification. The addition of "cash" and "cash confirmation" on the basis of the "three present principle" means that the results of on-site improvement will be converted into the amount to be confirmed, emphasizing the quantification of improvement results and cost awareness. The essence of the "Three Presence Principles" is to attach importance to the scene. As factory managers, we have learned that to solve on-site problems, we must go to the site.
(2) Laws for solving on-site problems
When solving on-site problems, the following steps should be followed, which is calLED the law of solving on-site problems here:
The first step is to go to the scene when problems occur;
The second step is to check the truth;
The third step is to take temporary measures on site;
The fourth step is to analyze the causes and find permanent countermeasures;
The fifth step is to regulate and prevent recurrence.

The above is the explanation given by the editor of pcb circuit board company.
If you want to know more about PCBA, you can go to our company's home page to learn about it.
In addition, our company also sells various circuit boards,
High Frequency Circuit Board and SMT chip are waiting for your presence again.

點擊
然后
聯系
主站蜘蛛池模板: 日本高清一二三不卡区| 国产成人无码免费看片软件| 狠狠cao2020高清视频| 亚洲成av人片在线观看无码不卡| 日本九九热在线观看官网| 日本一本一区二区免费播放| 无码av最新高清无码专区| 免费无码一区二区三区蜜桃大| 玩弄中年熟妇正在播放| 亚洲成在人线a免费77777| 亚洲综合av色婷婷五月蜜臀| 女人摸下面自熨视频在线播放| 亚洲小说少妇区图片| 永久免费的av在线电影网| 四川丰满肥嫩肥BBBBB| 中文字幕乱码无码人妻系列蜜桃| 99久久婷婷国产综合精品| 97色伦图片97综合影院| 少妇大胆瓣开下部自慰| 朝鲜女人大白屁股ass孕交| 亚洲精品成人a在线观看| 中文乱码人妻系列一区二区| 国产精品秘?久久久久久| 欧美丰满熟妇乱xxxxx视频| 国产自产v一区二区三区c| 国内精品久久久久久影院| 久久综合精品成人一本| 亚洲色大成网站www永久男同| 国产午夜无码福利在线看网站| 99视频国产精品免费观看| 国产成人精品日本亚洲语音| 色综合亚洲一区二区小说| 国产精品免费观看久久| 国产熟妇搡bbbb搡bbbb| 国产精彩亚洲中文在线| av天堂东京热无码专区| 丰满熟女人妻一区二区三| 2019久久久高清日本道| 天天爽夜夜爽夜夜爽精品视频 | 成人亚洲a片v一区二区三区动漫 | 潮喷失禁大喷水aⅴ无码|