How to Improve SMT Processing Efficiency
02Dec
Boy 0條評(píng)論

How to Improve SMT Processing Efficiency

How to Improve SMT Processing EffICiency
Today, let's talk about the efficiency of the placement machine in placement processing? The core of this problem is the delivery date Assuming that the data is available, the delivery date after online production depends on the processing speed and efficiency of the machine's<one href="/tw/" target="_blank">SMT chip The core point is to return to the placement machine and the placement speed of the placement machine The placement speed determines the production capacity of the placement machine and the placement processing plant, and is an important limiting factor for the production capacity of the entire placement processing line
1. Resettlement period.
The placement period is the most basic parameter of the placement speed of the MARKer. It refers to the time spent in picking up components, placing them on PCB after testing, and returning to the position of picking components. Each time these strokes are performed,

PCBA

The placement operation is completed, that is, the placement cycle is completed The normal high-speed machine placement cycle of the chip module is within 02s, and the current maximum placement cycle is 0.06. -0.03; The placement period of QFP for general purpose machine is 1-25, and the placement period of chip element is 0.30.6
2. Placement rate.
Placement rate refers to the number of components placed within 1h, organized as ch It is the patch speed measured by the patch machine manufacturer under ideal conditions The calculation of theoretical speed does not consider PCB loading and unloading time, and only a SMAll number of components (about 150 chip components) are attached. Then calculate the time used to install components, and calculate the 1h placement amount based on this
However, the following auxiliary time should be considered in actual SMT wafer processing and production.
a. PCB loading overhead time, usually 5-10 seconds.
b. Components on large (rectangular) PCBs are far apart, so the placement time will be extended.
c. Refueling time.
d. Machine maintenance time (days, weeks and months).
e. Unpredictable downtime.
In short, the actual placement speed is much lower than the theoretical placement speed, usually 65% - 70% of the theoretical placement speed. This is a problem that should be considered when selecting the mounter or calculating the production capacity of the mounter.
Methods to Improve the Production Efficiency of chip processing
SMT wafer processing efficiency has many aspects. For example, if the overall production capacity remains unchanged and the number of smt wafer production lines is large, the production speed can also be improved. However, operating costs are also increasing. Nowadays, the fierce competition in the electronic industry is unimaginable. For the existing patch production line, we must improve the patch rate and win customer satisfaction. The factors of resettlement rate and improvement measures are briefly introduced as follows:
The SMT production line is mainly composed of screen printing machine, high-speed SMT machine, multi-functional SMT machine, reflow welder and AOI automatic detector. If two placement machines complete a placement process (hereinafter referred to as placement time) when they are equal, the placement rate will be affected. The specific methods are as follows:
1. Balance load distribution. Reasonably allocate the number of two placement components to achieve balanced load distribution, so that the placement time of two placement machines is equal;
2. This smt is placed on the machine itself The placement machine itself has the maximum placement speed value, but it is usually not easy to realize this value This is related to the structure of the mounter itself For example, X's placement machine/Y structure takes the measure of making the placement head pick up components as many as possible at the same time On the other hand, when arranging the placement plan, the components of the same type are arranged together to reduce the number of nozzle changes when the placement head picks up the components and save placement time
點(diǎn)擊
然后
聯(lián)系
主站蜘蛛池模板: 久久俺也去丁香综合色| 久久午夜无码鲁丝片午夜精品| 精品第一国产综合精品蜜芽| 免费视频好湿好紧好大好爽| 亚洲伊人久久大香线蕉| 国产又色又爽又黄刺激视频 | 无遮挡又黄又刺激的视频| 亚洲精品国产成人| 永久黄网站免费视频性色| 肉大榛一进一出免费视频| 波多野结衣av一区二区无码| 无码人妻视频一区二区三区| 日本人成网站18禁止久久影院 | 国产精品天干天干有线观看| 亚洲性人人天天夜夜摸18禁止| 亚洲高清一区二区三区电影| 亚洲国产精品久久人人爱| 2019久久久高清日本道| 一区二区狠狠色丁香久久婷婷| 日本又色又爽又黄的a片18禁| 亚洲日韩日本中文在线| 午夜福利1000集在线观看| 久久精品免视看国产成人明星| 亚洲欧美日韩另类精品一区| 99999久久久久久亚洲| 69天堂人成无码麻豆免费视频| 免费久久99精品国产自在现| 黄网站色视频免费国产| 亚洲精品在看在线观看| 亚洲麻豆av成本人无码网站 | 久久一本人碰碰人碰| 成人亚洲精品久久久久软件| 成人无码网www在线观看| 国产午夜无码精品免费看动漫| 国产成人综合在线观看不卡| 蜜臀av人妻国产精品建身房| 一卡二卡三卡视频| 亚洲熟妇无码av在线播放| 一本到中文无码av在线精品| 国产精品福利自产拍在线观看| 日韩精品人妻系列无码av东京|