午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務(wù),零缺陷,輔助研發(fā)”P(pán)CBA訂購(gòu)單需求。
PCBA方案設(shè)計(jì)
PCBA方案設(shè)計(jì)
PCB proofing and baking problems in SMT chip processing plant
29Nov
Jeff 0條評(píng)論

PCB proofing and baking problems in SMT chip processing plant

Circuit board proofing, whICh can be disassembLED and understood. PCB, that is, epoxy resin circuit board, proofing, that is, the production of product samples. Therefore, PCB proofing, that is, before the mass production of PCB circuit boards, is to confirm whether the circuit design and product production plan are feasible, and the number of samples commissioned by manufacturers is generally SMAll.

Charging

pcb board

Is there charge for circuit board proofing? There is no absolute answer to this. The MARKet strategy, sample difficulty, sample delivery date, cooperation time and other reasons of circuit board manufacturers will affect its results. However, judging from the current development trend of PCB boards, the majority of manufacturers charge for PCB proofing, for the following reasons:

First, cost. Cost is an important indicator that any enterprise must evaluate. In the rigid circuit board industry, no matter how many pieces of circuit boards are produced, manufacturers must invest a certain amount of cost, such as labor, materials, technology, water and electricity. The technical fees and production processes invested in producing 1pcs and 1Kpcs PCBs are equal. A large number of samples will bring a certain amount of cost pressure to manufacturers;

Secondly, market factors. In PCB industry, "good and bad are mixed", and there are also real demanders, but there are also countless middlemen (especially individuals) doing trade. In order to minimize costs, such traders often cheat manufacturers to make PCB samples, take the samples and sell them to other traders or demanders, and then they will not order more batches, which leads to large losses for enterprises;

Third, the charge for proofing can attract the attention of manufacturers, thus ensuring the delivery date and quality to a certain extent.

Distribution of PCB proofing manufacturers

PCB belongs to the electronics industry, and the electronics industry is concentrated in the Pearl River Delta region of Guangdong Province. Especially, Shenzhen has become a world-class electronic market. Therefore, PCB manufacturers are mainly distributed in Shenzhen, Dongguan, Zhongshan, Zhuhai and other coastal areas.

Baking board problem in SMT small batch chip processing plant

Before SMT small batch patch processing plant's patch processing, there is a process that is not particularly noticed, that is, baking plate. In the electronic processing plant, some circuit boards that do not meet the requirements of Xi'an SMT chip processing due to long storage time and humidity in the storage environment can be removed of excess water after a reasonable baking process, which is conducive to the processing quality and makes SMT chip components and pads better combined. PCB baking is generally necessary only when the boards have been washed. Otherwise, more baking tiMES will cause the boards to bubble. But generally, the original PCB will have a humidity card. First, confirm whether the humidity exceeds the standard. Sometimes even if there is a drying bag in it, it will be affected with moisture, so baking is necessary.

Xi'an SMT small batch patch processing plant

Precautions for baking boards before chip processing in small batch chip processing plants.

1、 Requirements: the temperature is 120 ± 5 ℃, generally baking for 2 hours, and the time starts when the temperature reaches the baking temperature. Specific parameters can refer to the corresponding PCB baking specifications.

2、 Temperature and time:

1. Bake at 120 ± 5 ℃ for 2 hours if the manufacturing date is 2 to 6 months.

2. Bake at 120 ± 5 ℃ for 4 hours when the manufacturing date is 6 months to 1 year.

3. If the seal is unsealed for more than 5 days within 2 months of manufacturing date, bake at 120 ± 5 ℃ for 1 hour.

4. The PCB that is one year later than the manufacturing date shall be baked for 4 hours at 120 ± 5 ℃ and re sprayed with tin before being put into production.

5. The circuit boards that have been baked must be processed within 5 days, and those that have not been processed need to be baked for another hour before they can be put online.

3、 Processing method:

1. components that will not be used after repair do not need to be baked.

2. Most small and medium-sized circuit boards are placed horizontally, which can be stacked with 40 pieces. The number of vertical circuit boards is unlimited. Take them out of the oven within 10 minutes after baking, and then place them horizontally at room temperature for natural cooling.

3. The medium and large circuit boards in SMT small batch SMT chip processing plants are mostly placed horizontally, which can be stacked for 30 pieces, taken out of the oven within 10 minutes after baking, and naturally cooled at room temperature.

點(diǎn)擊
然后
聯(lián)系
主站蜘蛛池模板: 亚洲仺av香蕉久久| а天堂中文在线官网| 韩国精品久久久久久无码| 婷婷亚洲综合五月天小说| 久久在精品线影院| 粉嫩极品国产在线观看| 欧美白胖bbbbxxxx| 极品美女高潮呻吟国产剧情| 日本欧美一区二区三区乱码| 国产午夜鲁丝片av无码| 中文字幕亚洲综合久久菠萝蜜| 亚洲最新无码中文字幕久久 | 中文在线中文a| 国产亚洲精品成人aa片| 男女啪啪高清无遮挡免费| 国产精久久一区二区三区| 插插无码视频大全不卡网站| 国精产品一区一区三区有限公司| 一本之道高清无码视频| av明星换脸无码精品区| 无码国产福利av私拍| 精品爆乳一区二区三区无码av| 国产在线视频一区二区三区欧美图片 | 超碰人人超碰人人| 午夜亚洲国产理论片_日本| 久久精品国产自清天天线| 人人爽人人爽人人爽| 国产精品67人妻无码久久| 国产精品网红尤物福利在线观看 | 99国产精品久久99久久久| 久久久亚洲裙底偷窥综合| 日韩无套内射视频6| www国产亚洲精品久久网站| 国产成人a亚洲精v品无码| 国产在线观看www污污污| 日本免费精品一区二区三区| 3d无码纯肉动漫在线观看| 国产精品狼人久久久久影院| 交换交换乱杂烩系列yy| 中文字幕久久久人妻无码| 中国性欧美videofree精品|