午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務,零缺陷,輔助研發”PCBA訂購單需求。
PCB制造
PCB制造
Precautions for mechanical drilling in circuit board factory
29Nov
Andy 0條評論

Precautions for mechanical drilling in circuit board factory

Precautions for mechanICal drilling in circuit board factory


Circuit board manufacturer, circuit board designer and PCBA manufacturer explain the precautions for mechanical Drilling of circuit board factory


PCBA processing is to connect various electronIC components on PCB board through surface mount (SMT), plug-in (DIP) and other electronic assemblies. PCBA process flow mainly includes SMT, AOI, DIP, FCT testing and other processes. Due to the size difference of electronic components, there will be different processes and requirements in assembly and insertion. The assembly density of PCBA is relatively high, and the SMAll size and light weight of electronic products also have certain changes and requirements in mounting. The reliability, seismic resistance and excellent weldability of the products have high requirements for the hardware and software facilities of PCBA processing.


What matters should we pay attention to when operating mechanical drilling in our Circuit board factory? There is much knowLEDge in mechanical drilling. Follow the small editor to have a look!

Precautions for mechanical drilling in circuit board factory


circuit board


First of all, our circuit board factory (Shenzhen circuit board) must wear gloves on the contact board (keep it clean, replace it regularly, and do not touch the board surface if there is dirt on the gloves).

Of course, the operators of our circuit board factory (Shenzhen circuit board factory) should hold the board naturally with both hands when taking the board, and remove the sundries on the table, base plate, cover plate and board before loading the board; The rough edges on the four shoulders of the cushion should be brushed clean by Jiao Wei; The used cover plate shall be free from wrinkles. These are to ensure that our circuit boards will not be scrapped or damaged after production.


When the personnel of our circuit board factory (Shenzhen circuit board factory) are pasting the adhesive tape, the adhesive tape cannot be stuck to the board surface, and the drill board must be transported with a plug-in frame; Pay attention not to scratch during production and transportation. What are the precautions for equipment operation?


During machine operation, all age protection devices must be in working condition; If the machine needs to be shut down for more than six hours, each drill shaft chuck must be loaded into the drill bit before shutting down, and the UP and DOWN values of the drill must be set reasonably, which cannot be too high or too low; Use adhesive tape to stick the four sides of the cover plate to the table, and the adhesive tape is stuck to the place where the width of the plate is about 1/3 of the width of the adhesive tape. If a broken tool is found in the drilling, first find out the SPIndle where the broken tool occurs and record it on the corresponding cover plate.


The circuit board manufacturer, circuit board designer and PCBA processor will explain the precautions for mechanical drilling of circuit board factory.

點擊
然后
聯系
主站蜘蛛池模板: 西西4444www大胆无码| 久久久午夜成人噜噜噜| 国产 浪潮av性色四虎| 久久久久久久久久久免费精品| 国产无遮挡又黄又爽网站| 亚洲国产成人乱码| 四虎影视国产精品久久| 四虎永久在线高清国产精品| 不卡无在一区二区三区四区| 97精品国产手机| 欧洲女人性开放免费网站 | 免费精品国产人妻国语| 国产精品美女久久久网站动漫| 国产精品乱码久久久久久软件| 久久人妻av中文字幕| 巨爆乳无码视频在线观看 | 国产午夜无码视频在线观看| 日韩一区二区三免费高清| 噜噜吧噜吧噜吧噜噜网a| 午夜亚洲国产理论片中文飘花| 97精品人妻一区二区三区香蕉| 久久在精品线影院| 无码专区一ⅴa亚洲v天堂| 中国老妇女毛茸茸bbwbabes| 日韩欧美群交p片內射中文| 久久国产精品免费一区下载| 日韩免费无码专区精品观看| 欧美亚洲亚洲日韩在线影院| 一区二区三区无码不卡无在线| 欧美高清性色生活片免费观看| 777人体大胆中国人体哦哦| 无套内谢的新婚少妇国语播放| 中国女人和老外的毛片| 成人无码影片精品久久久| 亚洲综合另类小说色区一| 丰满人妻熟妇乱又伦精品劲| 国产凹凸在线一区二区| 久久无码高潮喷水| 亚洲第一区欧美国产综合| 波多老师无码av中字专区| 无码永久成人免费视频|