午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務,零缺陷,輔助研發”PCBA訂購單需求。
行業新聞
行業新聞
SMT management How to manage smt pipeline
31Oct
Andy 0條評論

SMT management How to manage smt pipeline

SMT management How to manage SMT pipeline


Management is the planning, organization and control of the daily production activities of the PCB factory. It is the general term of all management work related to product production and an important part of Pcb factory management.

1. PCB production management process organization

(1) PCB consists of production technology preparation process, basIC production process, auxiliary production process and production service process.

(2) Production process organization The production process shall be continuous, parallel (parallel operation of each stage and process), coordinated and rhythmic (balanced) to ensure economy. The purpose of production process organization is to reasonably and scientifically arrange production, avoid waste of manpower and material resources (equipment), improve labor productivity, shorten production cycle, reduce costs, reduce capital occupation, and complete the plan on schedule, with quality and quantity guaranteed.



PCB factory




2. Preparation of production operation plan The production operation plan of a workshop is an important tool to organize balanced production, complete production tasks and guide production activities in the workshop. Its work contents include:

(1) Formulate advanced and reasonable quality standards.

(2) Formulate monthly production operation plans for teams and workplaces.

(3) Calculate and balance the internal production capacity of the workshop.

(4) Control of production operation plan, including production scheduling, progress management, WIP management, operation accounting, production operation statistics and analysis.

(5) Put forward the plan of production technology organization measures.

3. Workshop production control Workshop production control refers to the supervision, inspection, adjustment and correction of the implementation of the operation plan in the workshop production process. The main work of workshop production control includes production scheduling, job accounting and job analysis.

(1) Production scheduling Production scheduling is the work of checking, supervising and assisting the production input and production progress of each link in production according to the requirements of the workshop operation plan. Scheduling is the key to completing the workshop operation plan. The dispatching work shall have sound systems, including duty system, reporting system, meeting system, on-site dispatching system, etc.

(2) Activity accounting includes the output and input of products and parts (production period and input period), completion schedule, work tasks completed in each link, utilization rate of production workers and equipment, etc.

(3) Job analysis Job analysis is the work after the requirements, records and accounting of production control, summarizing and analyzing the completion of indicators, and giving information feedback, so that it can be used as the basis for production activities and scheduling.

4. Application of group technology Group technology, also calLED group technology (GT for short), is a method based on the principle of SIMilarity to reasonably organize pcb production technology preparation and product production process. Group technology is to classify and code all parts in the workshop according to the classification system of geometric shape (shaft, disk, box, gear, etc.), size, processing method (turning, milling, planing, grinding, pliers, etc.), accuracy requirements (ordinary, precision, high precision), and blank type (bar, plate, tube, casting, forging, etc.), and divide part groups, so as to prepare for production and organize production. The production organization forms of group technology include:

(1) The group process center organizes some parts with similar structure to be processed uniformly on a certain equipment.

(2) A group production unit organizes one or more groups of parts with similar processes to provide a unified process route and arrange equipment.

(3) Group assembly line Group assembly line is used to process group production units with flow production characteristics in sequence, and the processing time of each operation is equal to the flow rhythm, which is used for batch production.

點擊
然后
聯系
主站蜘蛛池模板: 亚洲欧美日韩高清一区| 亚洲伊人久久大香线蕉综合图片 | 国产xxxx69真实实拍| 少妇高潮毛片免费看| 人妻无码中文专区久久av| 国产亚洲日本精品成人专区| 99er热精品视频| 无遮挡粉嫩小泬久久久久久久 | 日韩精品无码一本二本三本色| av永久免费网站在线观看| 色吊丝永久性观看网站| 欧美三级真做在线观看| 无码人妻久久久一区二区三区| 国产精品卡1卡2卡3网站| 久久成人成狠狠爱综合网| 韩国三级中文字幕无码| 伊人久久精品久久亚洲一区| 国产亚洲综合久久系列| 3d成人h动漫网站入口| 久青草国产在视频在线观看| 久久人人超碰精品caoporen| 国产成人精品午夜福利在线播放| 亚洲欧美国产国产一区二区| 成人免费视频无码专区| 羞羞午夜福利免费视频| 久久人妻天天av| 国产精品玖玖玖在线资源| 精品亚洲国产成av人片传媒| 国产成人精品2021| 137裸交肉体摄影| 狠狠久久永久免费观看| 真人作爱90分钟免费看视频| 色欧美片视频在线观看| 玩弄人妻少妇500系列| 国产成人亚洲综合网站| 欧美视频二区欧美影视| 亚洲国产成人一区二区三区| 亚洲顶级裸体av片| 人妻无码久久一区二区三区免费| 日韩精品人妻系列无码av东京| 精品丝袜国产自在线拍av|