午夜夜伦鲁鲁片免费无码-国产裸拍裸体视频在线观看-亚洲无码视频在线-学生妹亚洲一区二区-国产亚洲欧美日韩亚洲中文色

鑫景福致力于滿足“快速服務,零缺陷,輔助研發”PCBA訂購單需求。
PCBA加工
PCBA加工
How to prevent false soldering and false soldering in PCBA processing? What are the methods
29Oct
Andy 0條評論

How to prevent false soldering and false soldering in PCBA processing? What are the methods

How to prevent false soldering and false soldering in PCBA processing? What are the methods


The problem of false soldering and false soldering in PCBA production not only brings great potential quality problems to products, but also has a bad impact on customers, seriously affects the company's image, reduces production effICiency and increases production costs. Next, the following methods and measures will be provided to prevent false soldering and false soldering in PCBA processing.

The problem of false soldering and false soldering in PCBA production not only brings great potential quality problems to products, but also has a bad impact on customers, seriously affects the company's image, reduces production efficiency and increases production costs. Next, the following methods and measures will be provided to prevent false soldering and false soldering in PCBA processing.



PCBA



Due to the existence of false soldering and false soldering, the reliability of printed boards and the overall product is greatly reduced, unnecessary maintenance is caused in the production process, production costs are increased, production efficiency is reduced, and great quality and safety risks are caused to the products that have already left the factory, and after-sales maintenance costs are increased.

How to prevent false soldering and false soldering in PCBA processing? What are the methods

PCBA problem reduction and preventive measures

1. Important precautions during welding

1.1 Electric soldering iron: whether the soldering iron head is clean, smooth and free of oxidation. If there is an oxide layer, the soldering iron head needs to be wiped clean on the high-temperature sponge before welding; Whether the temperature control of the soldering iron is within the required range or not, too high or too low temperature will cause poor welding. Generally, the temperature is controlLED at 300 ° to 360 °, and the welding time is less than 5 seconds; Different power and types of electric soldering irons shall be selected according to the size of different parts and welding points and the shape of devices.

1.2 Solder wire: high-quality solder wire shall be selected. The amount of solder (63% tin, 37% lead) shall be appropriate. Solder joints shall be subject to wetting the pad with solder, and the vias shall also be wetted and filled.

1.3 Other materials and tools: correctly use the flux, check whether the equipment is normal when using the auxiliary welding equipment, and operate according to the operating instructions and precautions. Maintain the equipment in time after use. (SEMI automatic tin DIPping machine, crimping pliers, etc.)

1.4 Before welding, check whether the device pins are oxidized, and whether the wires, welding pads or transformer pins are oxidized. For oxide devices, the oxide layer should be removed first and then welded to prevent the existence of oxide layer which may lead to false soldering. The welding materials and environment shall be clean to prevent poor welding due to dirt and dust.

2. Strictly implement the relevant process regulations, give full play to the role of self inspection, mutual inspection and quality inspection in the production process, and improve the qualification rate of inspection through some necessary tools and tooling.

3. Relevant departments shall carry out targeted skills and knowledge training to improve employees' own operating skills; Explain the hazards of the above problems to employees, and improve the sense of responsibility of production employees; Take necessary documents to ensure the correctness and reliability of production.

4. The Quality Management Department shall strengthen the inspection of relevant problems and take special reward and punishment measures based on the existing Quality AssesSMEnt System for special and outstanding problems.

In the final analysis, the problem of false welding and false welding in welding is the responsibility and operation skills of employees. Employees should be allowed to truly form a product quality awareness, improve their responsibility and operation skills, improve production from devices, tools, relevant systems and other aspects, and minimize and prevent the occurrence of false welding and other unqualified problems.

The Circuit board manufacturer explains how to prevent false soldering and false soldering during PCBA processing? What are the methods

點擊
然后
聯系
主站蜘蛛池模板: 成年轻人网站色直接看| 亚洲国产aⅴ综合网| 精品久久亚洲中文字幕| 伊人久久大香线蕉av不卡| 国产精品1区2区3区在线观看| 人妻互换 综合| 成人亚洲区无码区在线点播| 春药按摩人妻弓中文字幕| 92国产精品午夜免费福利视频| 青青久久成人免费影院| 黄a大片av永久免费| 8090成人午夜精品无码| 国产黑色丝袜在线播放| 男女吃奶做爰猛烈紧视频| 18禁成人???猛撞视频在线看| 成人性能视频在线| 成人亚洲a片v一区二区三区蜜臀| 久久久精品午夜免费不卡| 狂野欧美性猛xxxx乱大交| 色欲久久久天天天综合网精品 | 男女作爱免费网站| 亚洲国产欧美在线综合其他| 精品深夜av无码一区二区| 四虎亚洲国产成人久久精品| 一区二区国产高清视频在线| 97se亚洲国产综合自在线观看| 久久久人人人婷婷色东京热| 亚洲国产人成在线观看69网站| 蜜臀av色欲a片无码一区二区| 中文字幕人乱码中文| 18禁美女裸体无遮挡免费观看国产| 精品久久久久久中文字幕大豆网| 亚洲 欧美 日韩 综合aⅴ视频| 无码午夜人妻一区二区不卡视频| 波多野结衣 黑人| 中文字幕无码av正片| 中国极品少妇videossexhd| 人妻人人添人妻人人爱| 西西大胆午夜人体视频| 丰满亚洲大尺度无码无码专线| 免费99精品国产自在现线|